| Client: |
Myerstown Water Authority, Myerstown, PA
|
| Project Date: |
1997
|
| Project Description: |
GVC coordinated and managed a pilot study to document treatability of proposed direct filtration treatment facilities to remove ground turbidity. The project included the preparation of the site development plan; the design of AutoCAD plans, and specifications for a 1,100 GPM water filtration facility with appurtenances. GVC was responsible for the bidding, construction phase engineering and the construction observation.
|
| Project Cost: |
$4.6 Million
|
| Client: |
Borough of Wyomissing
|
| Project Date: |
2004
|
| Project Description: |
GVC was responsible for the relocation of a 10" water main in Wyomissing Borough. GVC prepared the plans, specifications and contract documents for the project.
|
| Project Cost: |
$200,000
|
| Client: |
Caernarvon Township Authority
|
| Project Date: |
2005
|
| Project Description: |
GVC prepared the plans and specifications for the bidding of the painting of the interior and exterior of a 300,000 gallon steel water storage tank. GVC created the contract documents, in addition to assisting with the bidding process, administration of the construction and observation of the construction.
|
| Project Cost: |
$130,000
|
| Client: |
Myerstown Water Authority
|
| Project Date: |
1996
|
| Project Description: |
GVC was responsible for the preparation of the plans and specifications for the construction of a 300 GPM booster pump station with fire pump and jockey pump capabilities, in addition to dechlorination facilities and appurtenances. GVC assisted with the bidding process, performed the construction phase engineering, the construction observation and the preparation of the as-built drawings.
|
| Project Cost: |
$419,000
|